The price is for reference only. The actual price is subject to the communication between the two parties!!!
Product name |
reactor |
Model |
200L(customized) |
Materials |
stainless steel |
Product Description
High shear mixer homogenizer Stainless steel electric heating reactor price
Introduction to reaction kettle products:
The broad understanding of a reactor is that for a vessel with physical or chemical reactions, the structural design and parameter configuration of the vessel are carried out according to different process conditions. The design conditions, process, inspection, manufacturing, and acceptance should be in accordance with relevant technical standards to achieve the heating, steaming, cooling, and low and high-speed mixing reaction functions required by the process.
Laboratory Chemical pharmaceutical Vacuum Emulsifying Homogenizer reactor
Widely used in industries such as coatings, pharmaceuticals, daily chemicals, pigments, resins, food, and scientific research. The design of the mixing tank can choose to install heating and cooling devices according to the process requirements of the user's product, which meets the production requirements of different product processes. The mixing tank is composed of a tank body, a tank cover, and a mixer support transmission device.
Stainless steel Chemical pharmaceutical machinery Vacuum Emulsifying Homogenizer reactor
working principle:
1. Electric heating series: The work of the electric heating reaction kettle was originally to insert the electric heater into the jacket thermal oil, and use the thermal oil as the medium to transfer heat into the kettle, so that the materials inside the kettle absorb heat and heat up before reacting.
2. Steam heating series: The working principle of gas heating reaction kettle is to introduce boiler steam into the jacket of the reaction kettle, transfer steam heat into the kettle, and cause the materials inside the kettle to react.
Product Parameters
Packaging & Shipping
Company Profile
FAQ
Q. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery.Other payment terms can also be negotiated.
Q. How about your delivery time?
A: Generally, it will take 10 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q. Can you produce according to the samples?
A: Yes, we can produce molde by your samples or technical
drawings.
Q. Do you test all your machines before delivery?
A: Yes, we have 100% tested before delivery.