Morocco Daily Chemical Powder Multifunctional Electric 500KG Horizontal Mixer
The price is for reference only. The actual price is subject to the communication between the two parties!!!
The horizontal mixer is mainly used for the mixing of two or more types of materials, pre mixed materials, which can achieve rapid and uniform mixing in a short period of time. The shaft seals at both ends adopt special seals, with no leakage of powder liquid. The replacement cost of sealing consumables is low, and it is easy to replace. Therefore, it is a widely used, adaptable, and effective high-efficiency mixing equipment. It is used in putty paste, stone like paint, quartz sand powder, starch, rubber auxiliary dry powder, putty, medicine, food, chemicals, ceramic powder, milk powder, soybean powder, chemical industry, food, compound fertilizer, health care products, dyes, pigments, rubber, building materials, refractory materials, rare earth, plastic glass, new materials, nuclear energy materials, refractory materials, etc. (i.e. powder and powder), solid slurry (i.e. powder and slurry), Do not adapt to mixing sticky materials.
Precautions for installation and debugging of horizontal mixer:
1. The equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts.
2. During installation, attention should be paid to the vertical position of the main body and the horizontal.
3. After installation, check whether the bolts in each part are loose and whether the main engine compartment door is fastened.
4. Configure the power cord and control switch according to the power of the device.
5. After the inspection is completed, a no-load test run should be conducted, and production can only proceed after the test run is normal.
Shenyang Huazhiyi Machinery is a manufacturer that develops and produces various general equipment.
The company's main products are: mixers, packaging machines, filling machines, conveyors, reactors, dehydrators, crushers, etc.
Our philosophy is: integrity-based, strength first, and serve customers wholeheartedly.
Q. What is your terms of payment?
A: T/T 30% as deposit. and 70% before delivery.Other payment terms can also be negotiated.
Q. How about your delivery time?
A: Generally. it will take 10 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q. Can you produce according to the samples?
A: Yes, we can produce molde by your samples or technical drawings.
Q. Do you test all your machines before delivery?
A: Yes, we have 100% tested before delivery.