Chemical powder 500KG electric heating stainless steel horizontal mixer
The price is for reference only. The actual price is subject to the communication between the two parties!!!
The horizontal mixer can be made of carbon steel and stainless steel, and used for mixing food powder, pharmaceutical powder, chemical powder and paint powder, etc. It is mostly used for mixing two or more kinds of powder and mixing evenly.
,The horizontal mixer is used to mix the solid-solid (i.e. powder and powder) and solid-slurry (i.e. powder and slurry) of pepper powder, seasoning powder, milk powder, flour, pharmaceutical dry powder, chemical powder, laundry powder, putty powder, paint powder, etc.
Double-layer spiral blades are arranged on the driving spindle of the horizontal mixer. The external blades convey the materials to the middle and the internal blades convey the materials to the outside. Under the convection motion of the double-layer spiral belt, the material forms a mixed environment with low power and high efficiency. The inner and outer diameter screw installed on the mixing shaft drives the material in the barrel, so that the agitator can turn the material in a large range in the barrel. When the mixing device is working, the inner screw drives the material close to the shaft center to do axial rotation, and the axial direction is pushed from the inside to both sides. The outer screw drives the material close to the barrel wall to do axial rotation, and the axial direction is pushed from both sides to the inside, so that the mixed materials can be evenly mixed in a short time.
Shenyang Huazhiyi Machinery is a manufacturer that develops and produces various general equipment.
The company's main products are: mixers, packaging machines, filling machines, conveyors, reactors, dehydrators, crushers, etc.
Our philosophy is: integrity-based, strength first, and serve customers wholeheartedly.
Q. What is your terms of payment?
A: T/T 30% as deposit. and 70% before delivery.Other payment terms can also be negotiated.
Q. How about your delivery time?
A: Generally. it will take 10 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q. Can you produce according to the samples?
A: Yes, we can produce molde by your samples or technical drawings.
Q. Do you test all your machines before delivery?
A: Yes, we have 100% tested before delivery.